您当前的位置:
首页 >
文章列表页 >
Surface displacement during pipe roof construction of pipe-jacking group with large section
更新时间:2026-06-25
    • Surface displacement during pipe roof construction of pipe-jacking group with large section

    • Vol. 43, Issue 7, Pages: 1933-1941(2022)
    • DOI:10.16285/j.rsm.2021.1634    

      CLC: U455
    • Online First:04 August 2022,

      Published:2022

    移动端阅览

  • TANG Zheng, WANG Hong-xin, SUN De-an, et al. Surface displacement during pipe roof construction of pipe-jacking group with large section[J]. 2022, 43(7): 1933-1941. DOI: 10.16285/j.rsm.2021.1634.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

402

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Influences of shield advance rate and abnormal machine halt on tunnelling-induced ground surface settlements
Scattering of SH-waves by a shallow buried cylindrical inclusion with a partially debonded curve in half space
Mechanism of water infiltration affecting ground ice melting in the silty clay layers of the Dema Expressway in the eastern Qinghai-Xizang Plateau
Comparative theoretical and experimental analysis of rock breaking by tunnel boring machine disc cutters
Hydraulic scouring resistance characteristics of geosynthetics reinforced slopes

Related Author

LIN Cun-gang
ZHAO Jia-xi
QI Hui
YANG Zai-lin

Related Institution

Institute of Geotechnical Engineering, Zhejiang University
MOE Key Laboratory of Soft Soils and Geoenvironmental Engineering, Zhejiang University
College of Aerospace and Civil Engineering, Harbin Engineering University
0