您当前的位置:
首页 >
文章列表页 >
Calculation method of longitudinal deformation of metro shield tunnel overpassing existing line at short distance
更新时间:2026-06-25
    • Calculation method of longitudinal deformation of metro shield tunnel overpassing existing line at short distance

    • Vol. 43, Issue 3, Pages: 831-842(2022)
    • DOI:10.16285/j.rsm.2021.0864    

      CLC: U455.43;U231.3
    • Online First:23 March 2022,

      Published:2022

    移动端阅览

  • LIU Wei-zheng, DAI Xiao-ya, SUN Kang, et al. Calculation method of longitudinal deformation of metro shield tunnel overpassing existing line at short distance[J]. 2022, 43(3): 831-842. DOI: 10.16285/j.rsm.2021.0864.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

919

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Longitudinal deformation of existing tunnel due to underlying shield tunneling
Discussion on failure mechanism of retrogressive landslide and its reinforcement measures: taking a certain expressway retrogressive landslide for example
Study of gully bed erosion depth of viscous debris flow
Review of calculation methods of earth berm before retaining structure and a new simplified analytical method
Calculation method for ultimate bearing capacity of inflatable anchor

Related Author

HUANG Hong-wei
ZONG Xiang
ZHANG Dong-mei
ZHANG Si-yuan
ZHOU Ying-bo
XU Zhi-zhong
SHEN Bo
REN Wei-zhongP

Related Institution

Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
Department of Geotechnical Engineering, Tongji University
Highway Authority of Enshi Autonomous Prefecture
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
School of Environment and Resources, Southwest University of Science and Technology
0