您当前的位置:
首页 >
文章列表页 >
A calculation method of the time-dependent behavior for tunneling-induced ground settlement based on virtual image technique
更新时间:2026-06-25
    • A calculation method of the time-dependent behavior for tunneling-induced ground settlement based on virtual image technique

    • Vol. 43, Issue 3, (2022)
    • DOI:10.16285/j.rsm.2021.0696    

      CLC: P642.26;U231.3;U456.3
    • Online First:23 March 2022,

      Published:2022

    移动端阅览

  • LI Peng-fei, GOU Bao-liang, ZHU Meng, et al. A calculation method of the time-dependent behavior for tunneling-induced ground settlement based on virtual image technique[J]. 2022, 43(3). DOI: 10.16285/j.rsm.2021.0696.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

47

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study of time effect on top-down excavation of Shanghai Zhongshan Hospital
Experimental study of time effect of negative skin friction on pile
Experimental study of soil arching and transfer behavior of earth pressure about sheet-pile walls
Analysis of control standard for ground surface settlement in excavating metro station by shield tunnel combined with pile-beam-arch method
Study of time effect on vertical bearing capacity of open-ended pipe pile

Related Author

WANG Guo-cui
LIANG Zhi-rong
WEI Xiang
HUANG Ting
GONG Wei-ming
DAI Guo-liang
ZHENG Jin-hai
XU Guo-ping

Related Institution

Shenyuan Geotechnical Engineering Co., Ltd., Shanghai Xiandai Architectural Design Group
CCCC Highway Consultants Co., Ltd.
School of Civil Engineering, Southeast University
College of Harbour, Coastal and Offshore Engineering, Hohai University
School of Civil Engineering, Tianjin University
0