您当前的位置:
首页 >
文章列表页 >
Settlement analysis of large open caisson foundation at construction stage of Changtai Yangtze River Bridge
更新时间:2026-06-25
    • Settlement analysis of large open caisson foundation at construction stage of Changtai Yangtze River Bridge

    • Vol. 42, Issue 6, Pages: 1705-1712(2021)
    • DOI:10.16285/j.rsm.2020.1606    

      CLC: U445.55
    • Online First:16 June 2021,

      Published:2021

    移动端阅览

  • GUO Ming-wei, MA Huan, YANG Zhong-ming, et al. Settlement analysis of large open caisson foundation at construction stage of Changtai Yangtze River Bridge[J]. 2021, 42(6): 1705-1712. DOI: 10.16285/j.rsm.2020.1606.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

64

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Evolution of sedimentation rate and settlement prediction for dredged slurry under self-weight
Analysis of internal forces and displacement of pit supporting structure with scattered row piles considering soil arching effect
Study of accumulative plastic deformation of silty subgrade soil under repeated loading
Research on calculation of post-construction transverse surface settlement caused by shield tunneling
A practical method for calculating layerwise rebound at the bottom of foundation pit

Related Author

SONG Miao-miao
WANG Gang
CHEN Jun-hao
XIAO Gui-jin
LIN Xiu-hong
WANG Heng
YANG Min
GU Hai-dong

Related Institution

School of Civil Engineering, Yancheng Institute of Technology
Fujian Research Institute of Water Conservancy and Hydropower
CSCEC Strait Construction and Development Co., Ltd.
Key Laboratory of Underground Engineering, Fujian Province University, Fujian University of Technology
Department of Geotechnical Engineering, Tongji University
0