您当前的位置:
首页 >
文章列表页 >
Risk assessment model in TBM construction based on nonlinear fuzzy analytic hierarchy process
更新时间:2026-06-25
    • Risk assessment model in TBM construction based on nonlinear fuzzy analytic hierarchy process

    • Vol. 42, Issue 5, Pages: 1424-1433(2021)
    • DOI:10.16285/j.rsm.2020.0973    

      CLC: U455.1
    • Online First:08 May 2021,

      Published:2021

    移动端阅览

  • SONG Zhan-ping, GUO De-sai, XU Tian, et al. Risk assessment model in TBM construction based on nonlinear fuzzy analytic hierarchy process[J]. 2021, 42(5): 1424-1433. DOI: 10.16285/j.rsm.2020.0973.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

192

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Sub-regional nonlinear in-situ stress inversion analysis of complex high steep slope of open pit
Analysis of supporting effect of systematic bolts applied to weak and broken phyllite tunnels in meizoseismal area
Study of site monitoring of vertical full displacement of vault surrounding rock of tunnels and its change law
Research on comprehensive information intelligent monitoring system for tunnel excavation
Theoretical analysis model of deformation behavior of tunnel linings subjected to fire load

Related Author

WANG Jin-an
HUANG Kun
ZHANG Ran
ZOU Yu-lin
HE Chuan
ZHOU Y
WANG Bo
XU Jin-hua

Related Institution

Key Laboratory of Ministry of Education for Effective Mining and Safety of Metal Mines
School of Civil and Environmental Engineering, University of Science and Technology Beijing
Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of Civil Engineering, Southwest Jiaotong University
Sichuan Expressway Construction and Development Corporation
Key Laboratory for Special Area Highway Engineering of Ministry of Education, Chang’an University
0