您当前的位置:
首页 >
文章列表页 >
Simplified calculation method of decompression dewatering for deep excavation with suspended waterproof curtain
更新时间:2026-06-25
    • Simplified calculation method of decompression dewatering for deep excavation with suspended waterproof curtain

    • Vol. 42, Issue 3, (2021)
    • DOI:10.16285/j.rsm.2020.0240    

      CLC: TU463
    • Online First:17 March 2021,

      Published:2021

    移动端阅览

  • LI Ying, CHEN Dong, LIU Xing-wang, et al. Simplified calculation method of decompression dewatering for deep excavation with suspended waterproof curtain[J]. 2021, 42(3). DOI: 10.16285/j.rsm.2020.0240.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

181

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Derivation and validation of the motion equation for seepage in unsaturated soils
Study of the coupling model of rock elastoplastic stress-seepage-damage (Ⅰ) : Modelling and its numerical solution procedure
Analysis and numerical simulation of vacuum well point dewatering test
Risk control and dealing example of confined water of deep foundation pit
Research on multiple chemical grouting experiment of porous sandstone

Related Author

SHAO Long-tan
SUN Yan-pu
DONG Hao
WANG Jun-xiang
JIANG An-nan
SONG Zhan-ping
JIA Xiang-xin
NIE Qing-ke

Related Institution

Department of Engineering Mechanics, Dalian University of Technology
State Key Laboratory of Structural Analysis, Optimization and CAE Software for Industrial Equipment, Dalian University of Technology
Institute of Road and Bridge Engineering, Dalian Maritime University
College of Civil Engineering, Xi’an University of Architecture and Technology
Hebei Research Institute of Construction and Geotechnical Investigation Co. Ltd.
0