您当前的位置:
首页 >
文章列表页 >
Research on upper pipeline-soil interaction induced by shield tunnelling
更新时间:2026-06-25
    • Research on upper pipeline-soil interaction induced by shield tunnelling

    • Vol. 41, Issue 1, Pages: 221-228(2020)
    • DOI:10.16285/j.rsm.2018.2317    

      CLC: U455.43
    • Online First:05 January 2020,

      Published:2020

    移动端阅览

  • KE Wen-hai, GUAN Ling-xiao, LIU Dong-hai, et al. Research on upper pipeline-soil interaction induced by shield tunnelling[J]. 2020, 41(1): 221-228. DOI: 10.16285/j.rsm.2018.2317.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

563

下载量

9

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of deformation and force behavior of pile in double-parameter layered foundation subjected to combined horizontal dynamic load and torsional vibration
Experimental study on shear characteristics of mudstone under combined action of stress-dry-wet cycles
Investigation on thickness selection method of sealing steel plate for CAES gas storage caverns
Elasto-viscoplastic bounding surface model for unsaturated time-dependent soils incorporating non-stationary flow rule
Strength development model for slurry-like mud treated by physicochemical combined method considering preloading stress

Related Author

JIANG Jie
CHEN Li-jun
CHAI Wen-cheng
AI Yong-lin
OU Xiao-duo

Related Institution

School of Civil Engineering and Architecture, Guangxi University
State Key Laboratory of Featured Metal Materials and Life-Cycle Safety for Composite Structures, Guangxi University
Guangxi Ruiyu Construction Technology Co., Ltd.
0