您当前的位置:
首页 >
文章列表页 >
Stress mechanism and foundation contact pressure of high fill culvert under load reduction condition
更新时间:2026-06-25
    • Stress mechanism and foundation contact pressure of high fill culvert under load reduction condition

    • Vol. 40, Issue 12, Pages: 4813-4818(2019)
    • DOI:10.16285/j.rsm.2018.2291    

      CLC: TU432
    • Online First:04 January 2020,

      Published:2019

    移动端阅览

  • ZHANG Ye-qin, CHEN Bao-guo, MENG Qing-da, et al. Stress mechanism and foundation contact pressure of high fill culvert under load reduction condition[J]. 2019, 40(12): 4813-4818. DOI: 10.16285/j.rsm.2018.2291.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

166

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Field test on earth pressure of ancient seawall with different backfills for Qiantang River
Experimental study of high embankment culvert treated by imperfect ditch covered with a geogrid layer
Stress characteristics of high-fill box culvert with soft layers placed on the top and sidewall during construction
Model test on mechanical behavior of rigid load shedding culvert under high fill
Study of distribution law of earth pressure acting on shield tunnel lining based on in-situ data

Related Author

ZHENG Ye
CHEN Zhen-hua
ZHANG Kai-wei
ZHANG Jian-wei
SHEN Yue-jun
MA Qiang
ZHENG Jun-jie
ZHANG Jun

Related Institution

Reconnaissance and Design Institute, Qiantang River Administration of Zhejiang
School of Civil Engineering and Architecture, Hubei University of Technology
Institute of Geotechnical and Underground Engineering, Huazhong University of Science and Technology
Institute of Geotechnical and Underground Engineering, Huazhong University of Science and Technology
Engineering Faculty, China University of Geosciences (Wuhan)
0