您当前的位置:
首页 >
文章列表页 >
Settlement analysis of caisson foundation under main tower of a long span cable-stayed bridge for highway and railway
更新时间:2026-06-25
    • Settlement analysis of caisson foundation under main tower of a long span cable-stayed bridge for highway and railway

    • Vol. 40, Issue 3, Pages: 1113-1120(2019)
    • DOI:10.16285/j.rsm.2018.2270    

      CLC: U443.1;U448.27
    • Published:2019

    移动端阅览

  • TAN Guo-hong, XIAO Hai-zhu, DU Xun, et al. Settlement analysis of caisson foundation under main tower of a long span cable-stayed bridge for highway and railway[J]. 2019, 40(3): 1113-1120. DOI: 10.16285/j.rsm.2018.2270.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

174

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on prediction of chimney foundation settlement of Yangluo Power Plant in Wuhan
Verhulst mode for predicting foundation settlement
Nonlinear finite element analysis of strength and settlement of soft soil foudation under circular plank
Minutes of compacted line-soil pile foundation project for high apartment of Xi’an Jiaotong University
Mechanical properties and microstructural evolution of peaty soils subjected to freeze-thaw cycles

Related Author

LUO Hong-ming
TANG Hui-ming
YAN E-chuan
SONG Yan-Hui
NIE De-Xin
YING Yong -fa 1
PAN Wei-feng 2
REN Shu-hua1

Related Institution

Faculty of Engineering China University of Geosciences
Geological Engineering Institute,Chengdu University of Technology
Faculty of Architectural, Civil Engineering and Environment, Ningbo University
Architectural Design and Research Institute,Ningbo University
Geotechnical Investigation and surveying Institute of Machine Industry, XiAn
0