您当前的位置:
首页 >
文章列表页 >
软土深开挖致地铁车站基坑及邻近建筑变形特性研究
更新时间:2026-06-25
    • 软土深开挖致地铁车站基坑及邻近建筑变形特性研究

    • Vol. 40, Issue 4, Pages: 1515-1525(2019)
    • DOI:10.16285/j.rsm.2018.0116    

      CLC: TU433;U231.3
    • Published:2019

    移动端阅览

  • LIU Nian-wu, CHEN Yi-tian, GONG Xiao-nan, et al. 软土深开挖致地铁车站基坑及邻近建筑变形特性研究[J]. 2019, 40(4): 1515-1525. DOI: 10.16285/j.rsm.2018.0116.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

910

下载量

40

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Numerical simulation of displacement transfer law of excavation adjacent metro station
Research on calculation method of double-row piles retaining structure for deep excavation
Spatial mutual deformation analysis method for row of piles of deep excavation
Displacement superposition method of numerical analysis for determining influence of complex metro station construction on deformation of adjacent buildings
Study of spatial effect of excavation face for underground facility and its application

Related Author

LI Zhi-gao
ZENG Yuan
LIU Guo-bin
WU Gang
BAI Bing
NIE Qing-ke
LAI Guan-zhou
FANG Ying-guang

Related Institution

Department of Civil Engineering, Fujian University of Technology
The Third Harbor Engineering Investication & Design Institute
Department of Geotechnical Engineering, Tongji University
School of Civil Engineering and Architecture, Beijing Jiaotong University
Hebei Research Institute of Construction and Geotechnical Investigation Co.Ltd.
0