您当前的位置:
首页 >
文章列表页 >
Discussion on rockburst predictive method applying to TBM tunnel construction
更新时间:2026-06-25
    • Discussion on rockburst predictive method applying to TBM tunnel construction

    • Vol. 38, Issue S2, Pages: 241-249(2017)
    • DOI:10.16285/j.rsm.2017.S2.034    

      CLC: U452
    • Online First:05 June 2018,

      Published:2017

    移动端阅览

  • CHEN Wei-zhong, MA Chi-shuai, TIAN Hong-ming, et al. Discussion on rockburst predictive method applying to TBM tunnel construction[J]. 2017, 38(S2): 241-249. DOI: 10.16285/j.rsm.2017.S2.034.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

338

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Application of RBF neural network to rockburst prediction based on rough set theory
Segmental mechanical analysis of shield tunnel during construction stage
Discussion on rock strength estimating method based on TBM parameters
Dynamic prediction method of laboratory rockburst using sound signals
Regression analysis of support measures of underground powerhouses and support strength criteria

Related Author

QIU Dao-hong
LI Shu-cai
ZHANG De-yong
ZHANG Le-wen
WANG Meng-shu
YUAN Da-jun
SONG Ke-zhi
YANG Jian-ping

Related Institution

Geotechnical and Structural Engineering Research Center, Shandong University
College of Civil Engineering, Ludong University
Research Center of Tunneling and Underground Works, Beijing Jiaotong University
School of Civil and Architecture Engineering, Guangxi University
Key Laboratory of Disaster Prevention and Structural Safety of Ministry of Education, Guangxi University
0