您当前的位置:
首页 >
文章列表页 >
Estimation of ground support installation time based on the tunnel longitudinal displacement of convergence-confinement method
更新时间:2026-06-25
    • Estimation of ground support installation time based on the tunnel longitudinal displacement of convergence-confinement method

    • Vol. 38, Issue S1, Pages: 471-478(2017)
    • DOI:10.16285/j.rsm.2017.S1.058    

      CLC: U452
    • Online First:05 June 2018,

      Published:2017

    移动端阅览

  • ZHANG Yan-jun, SU Kai, ZHOU Li, et al. Estimation of ground support installation time based on the tunnel longitudinal displacement of convergence-confinement method[J]. 2017, 38(S1): 471-478. DOI: 10.16285/j.rsm.2017.S1.058.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

358

下载量

17

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Numerical simulation of behavior of jointed rock masses during tunneling and lining of tunnels
Analysis of stress path and deformation-failure mechanism of high cutting loess slope
Study of thermo-mechano-damage coupling behavior of surrounding rock of deep tunnel
Influence of excavation unloading on vertical bearing behavior of existing pile groups
Accumulated damage in surrounding rocks due to repeated blasting loads during blasting excavation of tunnels

Related Author

LIU Jun
KONG Xian-jing
HOU Xiao-kun
LI Tong-lu
LI Ping
JIA Shan-po
WU Bo
CHEN Wei-zhong

Related Institution

State Key Laboratory of Coastal & Offshore Engineering, Dalian University of Technology
School of Geological Engineering and Surveying, Chang’an University
Key Laboratory for Geo-hazards in Loess Area of Ministry of Land and Resources, Xi’an Center of Geological Survey, China Geological Survey
School of Urban Construction, Yangtze University
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
0