您当前的位置:
首页 >
文章列表页 >
Optimization study of first liner replacement timing of large deformation tunnel based on convergence-constraint principle
更新时间:2026-06-25
    • Optimization study of first liner replacement timing of large deformation tunnel based on convergence-constraint principle

    • Vol. 39, Issue S1, Pages: 395-404(2018)
    • DOI:10.16285/j.rsm.2017.2490    

      CLC: U452
    • Online First:02 September 2018,

      Published:2018

    移动端阅览

  • YANG Zhong-min, GAO Yong-tao, WU Shun-chuan, et al. Optimization study of first liner replacement timing of large deformation tunnel based on convergence-constraint principle[J]. 2018, 39(S1): 395-404. DOI: 10.16285/j.rsm.2017.2490.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

270

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Application in complicated high slope with strength reduction method based on discrete element method
露天矿边坡稳定性分析集成智能系统 附视频
离散元法用于块石土强夯过程模拟 附视频
Investigation on thickness selection method of sealing steel plate for CAES gas storage caverns
Mechanism of water infiltration affecting ground ice melting in the silty clay layers of the Dema Expressway in the eastern Qinghai-Xizang Plateau

Related Author

ZHENG Wen-tang
XU Wei-ya
NING Yu
3.西南交通大学岩土所!成都
8.110006
7.东北大学采矿系!沈阳
6.110006
5.东北大学采矿系!沈阳

Related Institution

Research Institute of Geotechnical Engineering, Hohai University
0