您当前的位置:
首页 >
文章列表页 >
Determination of coal pillar width between roadways of fully mechanised caving face with double roadways layout in a thick coal seam
更新时间:2026-06-25
    • Determination of coal pillar width between roadways of fully mechanised caving face with double roadways layout in a thick coal seam

    • Vol. 38, Issue 10, Pages: 3009-3016(2017)
    • DOI:10.16285/j.rsm.2017.10.030    

      CLC: TD35
    • Online First:05 June 2018,

      Published:2017

    移动端阅览

  • WANG Qi, FAN Yun-ping, LI Gang, et al. Determination of coal pillar width between roadways of fully mechanised caving face with double roadways layout in a thick coal seam[J]. 2017, 38(10): 3009-3016. DOI: 10.16285/j.rsm.2017.10.030.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

256

下载量

22

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Engineering experimentation of gob-side entry retaining formed by roof cutting and pressure release in a thick-seam fast-extracted mining face
Physical-mechanical properties and durability analysis of foamed lightweight soil based on excavated soil and fly ash
Mechanical properties and microstructural evolution of peaty soils subjected to freeze-thaw cycles
Optimal design of lining structure in artificial cavern of compressed air energy storage
Investigation on thickness selection method of sealing steel plate for CAES gas storage caverns

Related Author

HE Man-chao
GAO Yu-bing
YANG Jun
WANG Jian-wen
WANG Ya-jun
ZHU Zhen

Related Institution

State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining & Technology(Beijing)
School of Mechanics and Civil Engineering, China University of Mining & Technology(Beijing)
Shenmu Ningtiaota Coal Mining Company Ltd., Shaanxi Coal and Chemical Industry Group Company Ltd.
0