Analysis and comprehensive prevention-control for TBM jamming induced by squeezing deformation of surrounding rock around water diversion tunnel from Datong river into Huangshui river
|更新时间:2026-06-25
|
Analysis and comprehensive prevention-control for TBM jamming induced by squeezing deformation of surrounding rock around water diversion tunnel from Datong river into Huangshui river
HUANG Xing, LIU Quan-sheng, PENG Xing-xin, et al. Analysis and comprehensive prevention-control for TBM jamming induced by squeezing deformation of surrounding rock around water diversion tunnel from Datong river into Huangshui river[J]. 2017, 38(10): 2962-2972.
DOI:
HUANG Xing, LIU Quan-sheng, PENG Xing-xin, et al. Analysis and comprehensive prevention-control for TBM jamming induced by squeezing deformation of surrounding rock around water diversion tunnel from Datong river into Huangshui river[J]. 2017, 38(10): 2962-2972.DOI: 10.16285/j.rsm.2017.10.025.
Analysis and comprehensive prevention-control for TBM jamming induced by squeezing deformation of surrounding rock around water diversion tunnel from Datong river into Huangshui river
对该工程后续施工提出了最佳扩挖间隙和许可停机时间等卡机综合防控的3个对策:即扩挖间隙至少要增大到15 cm
此时停机初始时刻不发生卡机
许可停机时间为2 d;扩挖间隙增大到18 cm时
许可停机时间为4 d;扩挖间隙增大到20 cm时
就选取的围岩条件下
停机7 d内TBM基本不发生卡机
7 d后也很容易克服卡机。提出的卡机防控措施对引大济湟工程TBM安全高效掘进具有一定的指导意义
并得到工程实际控制对策的验证。
Abstract
This study aims to solve the problem of the frequent TBM jamming caused by the large squeezing deformation of surrounding rock around the water diversion tunnel from Datong river into Huangshui river in Qinghai province. Based on the constitutive model of squeezing deformation and the shield jamming prediction theory
we developed a procedure to calculate squeezing deformation and shield jamming. The main conclusions are drawn as follows. When TBM advances through F5 fault section and the overcut gap is 10 cm
the friction on the shield reaches the maximum thrust supplied by the propulsion system
which may result in shield jamming. As the growth of the downtime
the squeezing deformation
the contact area between surrounding rock and shield
and the friction on the shield increase with the stoppage. The growth rate is getting greater on the first day. However
the creep rate of surrounding rock and its friction growth rate decrease from the seventh day. The interaction between surrounding rock and shield reaches a balance until the thirteenth day
and the friction on the shield becomes stable. The above results are consistent with observed data in the field. Furthermore
to prevent and control shield jamming
we provide the following advice for optimal overcut and permissible downtime for further tunnelling. The over gap should be larger than 15 cm
under which the shield will not be jammed at the tunnelling unloading instant
and the permissive downtime is 2 days. When the overcut increases to 18 cm
the allowable stoppage is 4 days. While the over gap reaches 20 cm
shield jamming will not happen on the whole within 7 days under the surrounding rock condition
which also can be easily overcome. These control measures are substantially significant in the safety and efficiency of TBM tunnelling
which are also verified by the engineering practice.