XU Nu-wen, LI Tao, DAI Feng, et al. Stability analysis on the left bank slope of Baihetan hydropower station based on discrete element simulation and microseismic monitoring[J]. 2017, 38(8): 2358-2367.
DOI:
XU Nu-wen, LI Tao, DAI Feng, et al. Stability analysis on the left bank slope of Baihetan hydropower station based on discrete element simulation and microseismic monitoring[J]. 2017, 38(8): 2358-2367.DOI: 10.16285/j.rsm.2017.08.025.
Stability analysis on the left bank slope of Baihetan hydropower station based on discrete element simulation and microseismic monitoring
the stability problem of the complex high slopes subjected to excavation has become one of the key technical problems in the hydropower project construction. Based on the geomorphic conditions
characteristics of geologic framework and stress measurement data of the left bank slope of Baihetan hydropower station
by using the discrete element analysis procedure UDEC
a calculation model was established to study the stability of the left bank slope during excavation unloading. The principal stress field
deformation field and plastic yielded zones distribution law were studied under the condition of excavation
then the deformation mechanism of the left bank bedding rock slope has been declared. Meanwhile
the potential damage zone and critical sliding surface in deep rock mass were identified and delineated
by combination with the microseismic activity at the left bank slope during the periods of excavation and stress redistribution. The comprehensive studies indicated that the deformation of the left bank slope is mainly affected by multiple factors
such as tectonic stress
geological structure and unloading. The weak structure planes
such as LS3318
LS3319
LS331
LS337 and F17
play a decisive role in the excavation deformation of the left bank slope. The research results can provide valuable references for excavation and reinforcement of similar bedding rock slope projects.