您当前的位置:
首页 >
文章列表页 >
Maximum settlement calculation of rigid-pile composite foundation by method of compression of cushion between pile top and foundation
更新时间:2026-06-25
    • Maximum settlement calculation of rigid-pile composite foundation by method of compression of cushion between pile top and foundation

    • Vol. 37, Issue S2, Pages: 442-448(2016)
    • DOI:10.16285/j.rsm.2016.S2.058    

      CLC: TU473
    • Online First:09 June 2018,

      Published:2016

    移动端阅览

  • WANG Hui-chang, WANG Bin, JIANG Ren-gui, et al. Maximum settlement calculation of rigid-pile composite foundation by method of compression of cushion between pile top and foundation[J]. 2016, 37(S2): 442-448. DOI: 10.16285/j.rsm.2016.S2.058.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

182

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A simplified method for calculating settlement of rigid pile composite foundation
Settlement calculation and analysis of embankment with squeezing thick silt by blasting
CT triaxial rheological test on coarse-grained soils
Study of geomechanical model of Liangshuijing landslide in Three Gorges Reservoir area
Threshold strain study of dynamic Bouc-Wen model for soils

Related Author

ZHANG Yu-cheng
JIANG Yan
FAN Ze
YANG Guang-hua
DU Wen-bo
XU Xue-yong
DI Sheng-jie
WANG Ren

Related Institution

The Geotechnical Engineering Technology Center of Guangdong Province, Guangdong Research Institute of Water Resources and Hydropower
Guangdong Research Institute of Water Resources and Hydropower
School of Civil Engineering and Transportation, South China University of Technology
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
PowerChina Huadong Engineering Corporation Limited
0