您当前的位置:
首页 >
文章列表页 >
Analysis of longitudinal displacement of existing metro tunnel due to construction of above-crossing new tunnel in close distance
更新时间:2026-06-25
    • Analysis of longitudinal displacement of existing metro tunnel due to construction of above-crossing new tunnel in close distance

    • Vol. 37, Issue S1, Pages: 391-399(2016)
    • DOI:10.16285/j.rsm.2016.S1.051    

      CLC: U452
    • Online First:09 June 2018,

      Published:2016

    移动端阅览

  • LIANG Rong-zhu, XIA Tang-dai, HU Jun-hua, et al. Analysis of longitudinal displacement of existing metro tunnel due to construction of above-crossing new tunnel in close distance[J]. 2016, 37(S1): 391-399. DOI: 10.16285/j.rsm.2016.S1.051.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

759

下载量

42

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Improved joint model with routine method and an analytical solution of its inner forces
Study on one-dimensional consolidation behavior of saturated clay under cyclic loading
Analytical solution for progressive failure of interface between anchor and soil
Analytical solution of three-dimensional scattering and diffraction of plane Rayleigh-waves bya hemispherical alluvial valley with saturated soil deposit
Analytical solution of scattering of plane SH waves around a canyon with multi-layered alluvia

Related Author

HOU Gong-yu
YANG Yue
LIU Bo
WANG Shao-mei
XIA Sen-wei
JIANG Jun
CHEN Guo-zhou
JIA Jin-qing

Related Institution

School of Mechanics and Civil Engineering, China University of Mining & Technology(Beijing)
Heilongjiang College of Technology
Hangzhou Institute of buildings safety appraisal
College of Civil Engineering and Architecare, Zhejiang University
Structure Engineering Institute of State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology
0