您当前的位置:
首页 >
文章列表页 >
Experiment on connecting form between cutoff wall and composite geomembrane of cofferdam with existing wall mud
更新时间:2026-06-25
    • Experiment on connecting form between cutoff wall and composite geomembrane of cofferdam with existing wall mud

    • Vol. 39, Issue 5, Pages: 1761-1766(2018)
    • DOI:10.16285/j.rsm.2016.2407    

      CLC: TV223.4
    • Online First:12 June 2018,

      Published:2018

    移动端阅览

  • LI Bo, XIAO Xian-bo, XU Tang-jin, et al. Experiment on connecting form between cutoff wall and composite geomembrane of cofferdam with existing wall mud[J]. 2018, 39(5): 1761-1766. DOI: 10.16285/j.rsm.2016.2407.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

117

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study of connecting form between cutoff wall and composite geomembrane
Centrifugal model test and numerical simulation of embankments on sloping ground with weak interlayer
Numerical simulation for cutoff wall under backfilling construction of Daning reservoir
Analysis of effect of canyon terrain on stress and displacement of cutoff wall in dam foundation with deep overburden
Centrifugal model tests on sliding failure of a pile-stabilized high fill slope

Related Author

LIU Jun
LI Bo
LIU Yi-lin
HUANG Mao-song
YUAN Wei
WANG Hao-ran
LIU Guang-ming、 YUAN Hong-hu、 HUANG Wei-hong、 LIU Miao、 WANG Zhi-yin、
PAN Ying

Related Institution

Key Laboratory for Geotechnical Mechanics and Engineering of Minister of Water Resources, Yangtze River Scientific Research Institute
Research Institute of Highway, Ministry of Transport
Key Laboratory of Road Construction & Material, Ministry of Transport
Department of Geotechnical Engineering, Tongji University
Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
0