您当前的位置:
首页 >
文章列表页 >
Engineering experimentation of gob-side entry retaining formed by roof cutting and pressure release in a thick-seam fast-extracted mining face
更新时间:2026-06-25
    • Engineering experimentation of gob-side entry retaining formed by roof cutting and pressure release in a thick-seam fast-extracted mining face

    • Vol. 39, Issue 1, Pages: 254-264(2018)
    • DOI:10.16285/j.rsm.2016.2329    

      CLC: null
    • Online First:06 June 2018,

      Published:2018

    移动端阅览

  • HE Man-chao, GAO Yu-bing, YANG Jun, et al. Engineering experimentation of gob-side entry retaining formed by roof cutting and pressure release in a thick-seam fast-extracted mining face[J]. 2018, 39(1): 254-264. DOI: 10.16285/j.rsm.2016.2329.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

900

下载量

59

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Determination of coal pillar width between roadways of fully mechanised caving face with double roadways layout in a thick coal seam
Comparative theoretical and experimental analysis of rock breaking by tunnel boring machine disc cutters
Experimental study on shear characteristics of mudstone under combined action of stress-dry-wet cycles
Mechanism of water infiltration affecting ground ice melting in the silty clay layers of the Dema Expressway in the eastern Qinghai-Xizang Plateau
Anti-erosion mechanisms of microbially induced calcium carbonate precipitation-vegetation synergistic slope protection

Related Author

WANG Qi
FAN Yun-ping
LI Gang
GUO Wen-xiao
YAN Dian-hua
ZHANG Li-ping

Related Institution

Taiyuan Institute of China Coal Technology and Engineering Group
Shanxi Tiandi Coal Machinery Co., Ltd.
0