您当前的位置:
首页 >
文章列表页 >
Pre-load factor of the pre-stressed anchor cable in underground powerhouse with high geo-stress
更新时间:2026-06-25
    • Pre-load factor of the pre-stressed anchor cable in underground powerhouse with high geo-stress

    • Vol. 39, Issue 3, Pages: 1002-1008(2018)
    • DOI:10.16285/j.rsm.2016.0751    

      CLC: TU761.4
    • Online First:06 June 2018,

      Published:2018

    移动端阅览

  • ZHANG Jian-hai, WANG Ren-kun, ZHOU Zhong, et al. Pre-load factor of the pre-stressed anchor cable in underground powerhouse with high geo-stress[J]. 2018, 39(3): 1002-1008. DOI: 10.16285/j.rsm.2016.0751.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

195

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Inversion of rock mass mechanical parameter in underground powerhouse of Baishan pumped storage station
Engineering geological research on large span underground cavern in horizontal thin layered rock mass
Stability analysis of top-arch collapse composite treatments for Dagangshan Hydropower Station
Analysis of monitoring microseism in areas controlled by faults near powerhouse in Dagangshan hydropower station
Study of tensile strain criterion of high sidewall in large underground caverns

Related Author

YU Shen
LI Shou-ju
TIAN Ze-run
QI Jun-xiu
SUN Li-ping
WANG Shao-chuan
LI Yuan-zhong
SHENG Qian

Related Institution

State Key Laboratory of Structural Analysis for Industrial Equipment, Dalian University of Technology
HydroChina Beijing Engineering Corporation Limited
Dagangshan Branch of China Guodian Dadu River Hydropower Development Co., Ltd., Shimian
Sichuan Electric Power Design & Consulting Co., Ltd
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
0