您当前的位置:
首页 >
文章列表页 >
Pillar width determination and surrounding rocks control of gob-side entry with large cross-section and fully-mechanized mining
更新时间:2026-06-25
    • Pillar width determination and surrounding rocks control of gob-side entry with large cross-section and fully-mechanized mining

    • Vol. 37, Issue 6, Pages: 1721-1728(2016)
    • DOI:10.16285/j.rsm.2016.06.024    

      CLC: TD823
    • Online First:09 June 2018,

      Published:2016

    移动端阅览

  • ZHANG Guang-chao, HE Fu-lian. Pillar width determination and surrounding rocks control of gob-side entry with large cross-section and fully-mechanized mining[J]. 2016, 37(6): 1721-1728. DOI: 10.16285/j.rsm.2016.06.024.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

661

下载量

58

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Principal stress difference transfer law and support in large-section open-off cut
Spatial asymmetry of excess pore pressure during nonlinear consolidation with two-way drainage
Risk analysis and control study of super-shallow tunnel with large cross-section under water-rich channel
Investigation on rational barrier pillar width of reused gateroad in coal mines
Anchoring mechanism and effect of systematic rockbolt for shallow buried loess tunnel

Related Author

WANG Jun
WU Huan-kai
XU Lei
WANG Xiao-ming
HE Fu-lian
DING Zhou-xiang
QIU Yu-liang
LI Tao

Related Institution

School of Resources and Safety Engineering, China University of Minning and Technology (Beijing)
School of Civil Engineering, Beijing Jiaotong University
School of Civil Engineering, Central South University
Guangzhou Railway Group Corporation
State Key Laboratory of Coal Resources and Safe Mining, China University of Mining and Technology
0