您当前的位置:
首页 >
文章列表页 >
Analysis and engineering case of super-long pile refused hammer in offshore oil platform
更新时间:2026-06-25
    • Analysis and engineering case of super-long pile refused hammer in offshore oil platform

    • Vol. 36, Issue S2, Pages: 559-564(2015)
    • DOI:10.16285/j.rsm.2015.S2.078    

      CLC: TU473
    • Online First:14 June 2018,

      Published:2015

    移动端阅览

  • YAN Shu-wang, LI Jia, JIA Zhao-lin, et al. Analysis and engineering case of super-long pile refused hammer in offshore oil platform[J]. 2015, 36(S2): 559-564. DOI: 10.16285/j.rsm.2015.S2.078.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

200

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Arching effect analysis of core wall in Pubugou dam
Analytical solutions of critical water pressure when cracks propagating in surrounding rock of hydraulic tunnel
Influence of hydraulic fracturing on natural fracture in rock mass
Study on hydraulic fracture of gravity dam using the numerical manifold method
Application of enriched numerical manifold method to hydraulic fracture

Related Author

CHEN Jia-wei
DENG Jian-hui
MENG Fan-li
HU Wan-yu
LIN Jiang
HU Tian-qing
XIAO Ming
BIAN Kang

Related Institution

State Key Laboratory of Hydraulics and Mountain River Development and Protection, College of Water Resources & Hydropower, Sichuan University
HydroChina Chengdu Engineering Corporation
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University
Department of Engineering Mechanics, North China University of Water Resources and Electric Power
0