The construction of high gravelly soil corewall rockfill dams on thick overburden layer has developed rapidly in recent years. At the same time getting a clear understanding and a reasonable numerical simulation method of the deformation law is an important problem. The factors that affect the deformation of rockfill dams are many-sided and complex. The measured results of deformation are very significant for the above problems. Based on the monitoring data of Yaoji dam
a 100 m level gravelly soil corewall rockfill dam on thick overburden layer
and combined with the actual construction process and reservoir impounding process
the dam deformation
gravelly soil corewall deformation are analyzed. Maoergai dam has high similarity with Yaoji dam in the height of dam
the depth of overburden
the width of valley. Comparative analysis of these two dams’ monitoring data is also conducted. Based on the analysis
some clear understanding of the deformation law of this kind of dam are obtained. The influence of wetting deformation
creep deformation
construction and impounding method is learned
so as to provide reference for modeling and predicting deformations of similar projects.