A load transfer method for analyzing side-grouting uplift piles based on pile tests
Full-scale static load tests of four sets of uplift piles with side-grouted are carried out in the project of Shanghai Hongqiao Comprehensive Transportation Hub. Curves of side resistance and relative displacement relationship (?-w curve) of all soil layers in the pile range are derived based on the measured data. Firstly
make every soil layer τ-w curves of the full-scale test and the ?-w curves from the direct shear test normalized
in which the normalized parameters are the ultimate side resistance and the corresponding critical relative displacement of pile and soil. Secondary
a hyperbolic function is used to fit the normalized data; and then a unified ?/?ult-w/wult function curve is obtained. Finally
the unified fitted curve is applied into load-transfer method
and the pile head load-displacement relation
pile axial force and side friction distribution curve along the pile depth under different test load levels are gotten easily
so as to use it to predict bearing capacity and deformation properties. It is meaningful in the theoretical analysis and practical engineering.