您当前的位置:
首页 >
文章列表页 >
Analysis of settlement of cross tunnels under cyclic metro loading
更新时间:2026-06-25
    • Analysis of settlement of cross tunnels under cyclic metro loading

    • Vol. 36, Issue S1, Pages: 486-490(2015)
    • DOI:10.16285/j.rsm.2015.S1.084    

      CLC: U452
    • Online First:14 June 2018,

      Published:2015

    移动端阅览

  • GAO Guang-yun, LI Shao-yi, TU Mei-ji, et al. Analysis of settlement of cross tunnels under cyclic metro loading[J]. 2015, 36(S1): 486-490. DOI: 10.16285/j.rsm.2015.S1.084.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

393

下载量

11

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on long-term settlement behavior of driven pile foundation in Shanghai soft soil area
Long-term settlement of multi-story buildings on soft clay foundation in Shanghai
Method for long-term settlement prediction of pile-foundation in consideration of time effect of stress–strain relationship
Equivalent finite element method considering coupling pore pressure accumulation and dissipation
Anti-erosion mechanisms of microbially induced calcium carbonate precipitation-vegetation synergistic slope protection

Related Author

ZHOU Hong-bo
CHEN Zhu-chang
MA Gui-hua
CHEN Jin-jian
WANG Jian-hua
ZHOU Hong-bo
ZENG Qing-you
ZHOU Jian

Related Institution

Shanghai Jianke Project Management Co. Ltd.
Department of Geotechnical Engineering, Tongji University
Department of Civil Engineering, Shanghai Jiao Tong University
Shanghai Research Institute of Building Sciences
Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
0