您当前的位置:
首页 >
文章列表页 >
Full process of static and dynamic performances of cantilever anti-slide pile
更新时间:2026-06-25
    • Full process of static and dynamic performances of cantilever anti-slide pile

    • Vol. 39, Issue 3, Pages: 854-862(2018)
    • DOI:10.16285/j.rsm.2015.2582    

      CLC: TU473
    • Online First:06 June 2018,

      Published:2018

    移动端阅览

  • ZHENG Tong, LIU Hong-shuai, YUAN Xiao-ming, et al. Full process of static and dynamic performances of cantilever anti-slide pile[J]. 2018, 39(3): 854-862. DOI: 10.16285/j.rsm.2015.2582.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

282

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Centrifugal model test study of interaction of gridding concrete retaining wall and soft soil
Study of distribution law of earth pressure acting on shield tunnel lining based on in-situ data
Analysis of seismic active earth pressure under vertical steady seepage
Development of a calibration chamber for cone penetration test and corresponding experimental research
Earth pressure on shotcrete of flexible retaining method with prestressed anchor

Related Author

ZHOU Guang-zhu
XU Wei
CHEN Yu
LI Xue
ZHOU Shun-hua
WANG Pei-xin
LI Xiao-long
HUANG Rui

Related Institution

Department of Geotechnical Engineering, Tongji University
The Key Laboratory of Road and Traffic Engineering, Ministry of Education, Tongji University
MOE Key Laboratory of Soft Soils and Geoenvironmental Engineering, Zhejiang University
Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University
College of Resources and Environmental Engineering, Shandong University of Science and Technology
0