您当前的位置:
首页 >
文章列表页 >
A method for predicting ground surface settlement in the artificial thawing period of tunnel horizontally frozen wall
更新时间:2026-06-25
    • A method for predicting ground surface settlement in the artificial thawing period of tunnel horizontally frozen wall

    • Vol. 36, Issue 12, Pages: 3516-3522(2015)
    • DOI:10.16285/j.rsm.2015.12.023    

      CLC: TU478
    • Online First:14 June 2018,

      Published:2015

    移动端阅览

  • CAI Hai-bing, PENG Li-min, ZHENG Teng-long. A method for predicting ground surface settlement in the artificial thawing period of tunnel horizontally frozen wall[J]. 2015, 36(12): 3516-3522. DOI: 10.16285/j.rsm.2015.12.023.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

238

下载量

13

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A duration prediction model of surface thawing settlement in construction period of tunnel with horizontal freezing method
Analysis of control standard for ground surface settlement in excavating metro station by shield tunnel combined with pile-beam-arch method
A duration prediction model of surface frost heave induced by tunnelling with horizontal freezing method
Study of flow-solidification method and fluidity test of dredged clays
Numerical analysis of estimation of ground surface settlement outside pit induced by soft-soil excavation

Related Author

ZHENG Teng-long
PENG Li-min
CAI Hai-bing
CAO Rui-lang
LIU Jun
HE Shao-hui
WANG Fang
ZHENG Teng-long

Related Institution

School of Civil and Transportation Engineering, Beijing University of Civil Engineering and Architecture
School of Civil Engineering, Beijing Jiaotong University
Institute of Geotechnical Engineering, School of Transportation, Southeast University
School of Civil Engineering, Tianjin University
Institute of Geotechnical Engineering, Zhejiang University
0