您当前的位置:
首页 >
文章列表页 >
Post-construction settlement analysis of loess-high filling based on time-dependent deformation experiments
更新时间:2026-06-25
    • Post-construction settlement analysis of loess-high filling based on time-dependent deformation experiments

    • Vol. 36, Issue 10, Pages: 3023-3031(2015)
    • DOI:10.16285/j.rsm.2015.10.037    

      CLC: TU444
    • Online First:13 June 2018,

      Published:2015

    移动端阅览

  • ZHU Cai-hui, LI Ning. Post-construction settlement analysis of loess-high filling based on time-dependent deformation experiments[J]. 2015, 36(10): 3023-3031. DOI: 10.16285/j.rsm.2015.10.037.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

502

下载量

23

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Investigation on thickness selection method of sealing steel plate for CAES gas storage caverns
Elasto-viscoplastic bounding surface model for unsaturated time-dependent soils incorporating non-stationary flow rule
Experimental study on the definition and evolution characteristics of unfrozen water retention states in frozen clay
Optimal design of lining structure in artificial cavern of compressed air energy storage
Progressive fracture evolution and mechanical response of cavity-containing sandstone under low-frequency disturbance

Related Author

No data

Related Institution

No data
0