您当前的位置:
首页 >
文章列表页 >
Distance between location of displacement applied boundary and passive pile
更新时间:2026-06-25
    • Distance between location of displacement applied boundary and passive pile

    • Vol. 36, Issue 10, Pages: 2934-2938(2015)
    • DOI:10.16285/j.rsm.2015.10.025    

      CLC: TU473.1
    • Online First:13 June 2018,

      Published:2015

    移动端阅览

  • SHANGGUAN Shi-qing, YANG Min, LI Wei-chao. Distance between location of displacement applied boundary and passive pile[J]. 2015, 36(10): 2934-2938. DOI: 10.16285/j.rsm.2015.10.025.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

274

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Two-stage analysis of responses of bridge pile foundations to adjacent surcharge
Numerical analysis of stability of highway embankments and karst cave roofs in karst region
Experimental study of pore water pressure variation law of muck under high energy impact
Study of reverse catenary shape of installation line for drag anchors embedded in seabed soils
Physical-mechanical properties and durability analysis of foamed lightweight soil based on excavated soil and fly ash

Related Author

FENG Chang-ming
MU Lin-long
SUN Zhi-wei
WANG Yao-zhong
DAI Zi-hang
FAN Xia-ling
LU Cai-jin
LI Zhang-ming

Related Institution

Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
CNPC Southeast Asia Pipeline Co., Ltd.
PetroChina West-East Gas Pipeline Company
Institute of Geotechnical Engineering, Fuzhou University
School of Civil, Mining and Environmental Engineering, University of Wollongong
0