A 3D elastoplastic numerical model is developed for the structure-soil layers-pipeline system in the Gongyixiqiao metro station project of Beijing metro line 4
and used to analyze the deformation of pipeline and its surrounding soil
based on the measured displacement data. By combing the field monitoring data
numerical simulations and empirical formulations
the effects of pipeline stiffness on ground deformation are analyzed. It is shown that as the soil-pipe stiffness k is less than 0.18
the differential soil-pipe settlement is less than 5%
and the empirical formulation can be used to calculate the soil settlement at the level of pipeline axis. With the increase of pipeline stiffness
the pipeline can constrain the ground movement more significantly
resulting in a reduction of the growth rate of ground settlement or even a negative growth so that the surface settlement can even exceed the ground settlement. By a fitting analysis of the numerical results
a method is proposed for estimating the maximum pipeline settlement for rigidly jointed pipelines
which is based on the soil-pipe stiffness and tunnel-induced ground surface settlement. The method has been used to calculate an actual project settlement
and the difference between the calculated and measured values is found to be less than 4%