HU Jun, YANG Ping. Numerical analysis of temperature field within large-diameter cup-shaped frozen soil wall[J]. 2015, 36(2): 523-531.
DOI:
HU Jun, YANG Ping. Numerical analysis of temperature field within large-diameter cup-shaped frozen soil wall[J]. 2015, 36(2): 523-531.DOI: 10.16285/j.rsm.2015.02.031.
Numerical analysis of temperature field within large-diameter cup-shaped frozen soil wall
This paper presents a comprehensive study of the generation and distribution patterns of the temperature field within a large-diameter cup-shaped frozen soil wall used in shield construction of Nanjing Subway Line 10. Three dimensional finite element analyses are taken to elucidate various influential factors for the temperature field. It is found that
if the thicknesses of cup-shaped frozen soil walls can satisfy the designed amounts needed for the purpose of ground reinforcement
frozen wall forms in a clear sequence: firstly
in the outer tubes
then the intermediate tubes
and lastly
the inner tubes. The “closure time” of the frozen wall
which means the time period required for the full formation of the frozen soil wall
is heavily dependent on soil’s thermal conductivity as well as the original ground temperature. The closure time would decrease linearly with the increase of the thermal conductivity; it would increase linearly with the increase of original ground temperature of soil and volumetric heat capacity. For the concerned Nanjing shield tunneling site
it took around 12 days. This would have increased by approximate every one more day if the original ground temperature increases by every 5℃. The latent heat is found to be of no apparent influence in the cooling process of soil. Notwithstanding
the cooling speed varies much with different types of soil. Generally
the cooling speed of sandy cemented soil and sand is faster than that of clay cemented soil and clay respectively. However
they reach the phase-transitional-stage almost simultaneously. It is also noted that the frozen walls in sand are always formed 4 days earlier than those in clay regardless of whether the cement is in place or not. Results and conclusions from this research may play a useful role to aid designs of similar projects in the future.
Study of thermal field of soil freezing in shallow covered tunnel with subsurface excavation passing through ground with thin aquifer under complex conduction
A liquid-solid dynamic coupling modelof ultrasound enhanced coalbed gas desorption and flow
Numerical simulation of temperature field in surrounding rock of deeply buried roadways under seepage action
Numerical simulation of embankment dam seepage monitoring with temperature based on thermal-hydro coupling model
Coupling mechanism of seepage and heat transfer in rock fracture based on physics-informed neural networks
Related Author
YUAN Yun-hui
YANG Ping
JUANG Tian-qian
YI Jun
JIANG Yong-dong
XUAN Xue-fu
LUO Yun
ZHANG Yu
Related Institution
College of Civil Engineering, Nanjing Forestry University
Second Department of China Railway Tunneling Group Corporation
Chongqing University of Science & Technology
Key Laboratory of Exploitation of Southwest Resources & Environmental Disaster Control Engineering, Ministry of Education, Chongqing University
Institute of Civil Engineering, Liaoning Technical University