您当前的位置:
首页 >
文章列表页 >
Stress of large cylindrical caisson structure and its adjacent settlement
更新时间:2026-06-25
    • Stress of large cylindrical caisson structure and its adjacent settlement

    • Vol. 36, Issue 2, Pages: 502-508(2015)
    • DOI:10.16285/j.rsm.2015.02.028    

      CLC: TU753.6+4
    • Online First:13 June 2018,

      Published:2015

    移动端阅览

  • DENG You-sheng, WAN Chang-zhong, YAN Wei-ling. Stress of large cylindrical caisson structure and its adjacent settlement[J]. 2015, 36(2): 502-508. DOI: 10.16285/j.rsm.2015.02.028.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

550

下载量

18

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Monitoring data and finite element analysis of long term settlement of Yongjiang immersed tunnel
Model test on pile-plank roadbed of high-speed railway overlying goafs
Research on construction displacement of north anchorage caisson of parrot cay Yangtze River bridges in Wuhan
Monitoring and analysis of tunnel surface stability
Development of drill monitoring instrument for frozen soil settlement

Related Author

XIE Xiong-yao
WANG Pei
LI Yong-sheng
NIU Jian-hong
QIN Hui
LI Chuan-bao
CHENG Qian-gong
LIANG Xin

Related Institution

Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
Department of Geotechnical Engineering, Tongji University
Yongjiang Tunnel Administration
China Railway Siyuan Survey & Design Group Co., Ltd.
Department of Geological Engineering, Southwest Jiaotong University
0