The embankment behind the bridge abutment of the high speed railway is different from the general railway in the aspects of padding
construction control and quality supervision.However
there is a little experimental research of the earth pressure behind abutment;and there are a lot of factors influencing the earth pressure also;and the distribution of the earth pressure is not exact predicted through actual earth pressure theories.Therefore
a long-time in-situ observation was practiced to gain the first materials.Based on the experiment results
the changing of the earth pressure with time and the height of embankment
the magnitude and distribution of earth pressures behind the abutment are given.Test results show
the earth pressure behind abutment is nonlinearity with the depth of abutment.To begin with
the earth pressure of abutment increased with the depth of abutment
later
it minished with the depth increasing of abutment.The comparison are made between formula presented with the experimental observations;the points of application of the resultant earth pressures have significantly difference;the height of actual action point of resultant earth pressure is 0.41 of the embankment height.