您当前的位置:
首页 >
文章列表页 >
Prediction for structural settlement of flood-control wall along the bund in Shanghai
更新时间:2026-06-25
    • Prediction for structural settlement of flood-control wall along the bund in Shanghai

    • Issue 8, Pages: 1287-1292(2006)
    • DOI:10.16285/j.rsm.2006.08.012    

      CLC: TV87
    • Published:2006

    移动端阅览

  • CHEN Bao1, CHENG Hui-feng2, YANG Lin-de1. Prediction for structural settlement of flood-control wall along the bund in Shanghai[J]. 2006, (8): 1287-1292. DOI: 10.16285/j.rsm.2006.08.012.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

152

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Prediction for structural settlement of flood-control wall along the bund in Shanghai
Kernel design for displacement time series of landslide
A predicative study of loosening zones around roadways with least square support vector machines method with optimized parameters
Prediction of behavior of piled raft foundation for Shanghai World Financial Center of 101-storey
Time effect analyses and prediction of ultimate bearing capacity of jacked pile in clay

Related Author

CHEN Bao
CHENG Hui-feng
YANG Lin-de
LENG Wu-ming
FU He-lin
DONG Hui
MA Wen-tao
ZHAO Xi-hong

Related Institution

School of Civil and Architectural Engineering, Central South University
Civil Engineering and Mechanics, Xiangtan University
Department of Maths & Computer Engineering, Ningxia University
Department of Geotechnical Engineering, Tongji University
Haiyan Construction Engineering Quality Supervision Station,Haiyan
0