您当前的位置:
首页 >
文章列表页 >
Construction monitoring and analysis of double large-diameter annular arched girders support system in double foundation pit excavation
更新时间:2026-06-25
    • Construction monitoring and analysis of double large-diameter annular arched girders support system in double foundation pit excavation

    • Issue 7, Pages: 1204-1208(2006)
    • DOI:10.16285/j.rsm.2006.07.038    

      CLC: TU753
    • Published:2006

    移动端阅览

  • JIANG Xin-liang, SUN Liang-tao, ZONG Jin-hui. Construction monitoring and analysis of double large-diameter annular arched girders support system in double foundation pit excavation[J]. 2006, (7): 1204-1208. DOI: 10.16285/j.rsm.2006.07.038.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

253

下载量

30

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

导洞条件下隧洞围岩应变能调整与破坏规律研究
冻结黏土未冻水赋存状态界定与演化特征试验
基于开挖弃土与粉煤灰的泡沫轻质土物理力学性能及耐久性分析
2025年缅甸7.9级地震场地液化震害分析
水分入渗对青藏高原东部德马高速粉质黏土层地下冰融化影响机制

Related Author

No data

Related Institution

No data
0