您当前的位置:
首页 >
文章列表页 >
Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches
更新时间:2026-06-25
    • Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches

    • Issue 7, Pages: 1171-1175(2006)
    • DOI:10.16285/j.rsm.2006.07.031    

      CLC: TU433
    • Published:2006

    移动端阅览

  • ZHANG Yi-ping1, YU Ya-nan1, ZHOU Hong-wei2. Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches[J]. 2006, (7): 1171-1175. DOI: 10.16285/j.rsm.2006.07.031.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

236

下载量

18

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches
Numerical analysis of surcharge preloading consolidation effects on soft foundation
FEM of traffic-load-induced settlement of road on soft clay
Analysis and calculation of municipal solid waste settlement during landfilling
A preliminary research on theory and application of unsaturated red layers embankment settlement

Related Author

ZHANG Yi-ping
YU Ya-nan
ZHOU Hong-wei
ZHANG Kai-peng
XIONG Yan-wen
XIA Yuan-you
LIU Xin-xi
WEI Xing

Related Institution

School of Civil Engineering and Architecture, Wuhan University of Technology
Department of Geotechnical Engineering, Southwest Jiaotong University
Ertan Hydropower Development Engineering Company Ltd.
Southwest Reconnoiter & Design Institute Company Ltd. of Nuclear Industry
College of Civil Engineering, Chongqing University
0