您当前的位置:
首页 >
文章列表页 >
Reducing uplift of underground structures using cutoff walls
更新时间:2026-06-25
    • Reducing uplift of underground structures using cutoff walls

    • Issue 7, Pages: 1049-1055(2006)
    • DOI:10.16285/j.rsm.2006.07.006    

      CLC: TU93;TU435
    • Published:2006

    移动端阅览

  • LIU Hua-bei, SONG Er-xiang. Reducing uplift of underground structures using cutoff walls[J]. 2006, (7): 1049-1055. DOI: 10.16285/j.rsm.2006.07.006.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

309

下载量

16

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Argument on reinforcing scheme for underground drainage and observation gallery the upper reservoir of Tianhuanping pumping water storage power station
应力-干湿循环联合作用下泥岩剪切特性试验研究
冻融循环对泥炭土力学特性及微观结构演化的影响研究
2025年缅甸7.9级地震场地液化震害分析
推移式碎石土滑坡空间变异基本结构力学特性研究

Related Author

ZHOU Jian-bo
CHEN Ming-xiang
GAO Zuo-ping
SUN Ying
ZHUO Wei-dong
ZHUANG Shu-man
GU Yin
SONG Lin-hui

Related Institution

The Research Center for Building Inspection and StrenGthening Engineering, Wuhun University
武汉大学建筑物检测与加固工程研究中心
College of Civil Engineering, Fuzhou University
School of Physical and Mathematical Sciences, Nanjing Tech. University
College of Civil Engineering and Architecture, Guangxi University
0