您当前的位置:
首页 >
文章列表页 >
Risk Analysis of Crude Oil Tank Overhaul Operation based on Improved JHA Method
更新时间:2026-01-19
    • Risk Analysis of Crude Oil Tank Overhaul Operation based on Improved JHA Method

    • Issue 4, Pages: 151-155(2022)
    • DOI:10.16056/j.2096-7705.2022.04.025    

      CLC: TE88
    • Published:2022

    移动端阅览

  • 洪雷, 高建勋, 苗建敏, et al. Risk Analysis of Crude Oil Tank Overhaul Operation based on Improved JHA Method[J]. 2022, (4): 151-155. DOI: 10.16056/j.2096-7705.2022.04.025.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

5

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Risk Analysis of EPC Contract for Oversea Power Plant Project
Analysis and Control on Ventures of Clean Development Mechanism Projects

Related Author

陈杰
余裕平
严玉平
王文军

Related Institution

国核电力规划设计研究院
江西省山江湖开发治理委员会办公室
江西省水利水电学校
江西省CDM技术服务中心江西南昌
0