it will inevitably have a serious impact on the progression and quality of power station’s construction. Through the basis of boiler equipment supervision
including supervision agreement signed and implemented and preparation technology
summarizes the common problems in boiler equipment supervision
and put forward the methods and suggestions for equipment supervision
such as completing the supervision tasks according to the supervision parts and witness points stipulated in the implementation table of the supervision project
strengthening on-site inspection and so on
in the hope of further reducing the defect rate of boiler equipment sent to the installation site and providing help for boiler equipment supervision in other projects.