周巍. Water Saving Transformation of Thermal Power Plant based on Water Balance Test[J]. 2020, (2): 112-114. DOI: 10.16056/j.2096-7705.2020.02.024.
Water Saving Transformation of Thermal Power Plant based on Water Balance Test
摘要
江西某2×660 MW火电厂为解决年度取水量超标问题
对电厂进行水平衡测试
并结合电厂用水现状
分析用水不合理的地方
有针对性地处理优化了复用水溢水、冷却塔补水口选址不当、生活用水水量超标等问题
并对循环水系统排污水回收项目进行可行性研究
大大降低了电厂单位发电取水量
取得了预期效果
为火电厂的节水减排及水务管理工作提供借鉴。
Abstract
In order to solve the problem of over standard annual water intake
Jiangxi 2×660 MW thermal power plant conducts water balance test for the power plant
analyzes the unreasonable water consumption based on the current water consumption situation of the power plant
deals with and optimizes the problems such as reuse water overflow
improper location of cooling tower water supplement
over standard domestic water consumption
and conducts feasibility study on the recycling project of circulating water system sewage
greatly reducing the power consumption The water intake of unit power generation can provide reference for water saving and emission reduction and water management of thermal power plants.