您当前的位置:
首页 >
文章列表页 >
Method and Function of Setting Fire-proof Isolation Layer in Desulfurization Absorption Tower
更新时间:2026-01-19
    • Method and Function of Setting Fire-proof Isolation Layer in Desulfurization Absorption Tower

    • Issue 3, Pages: 87-89(2019)
    • DOI:10.16056/j.1005-7676.2019.03.025    

      CLC: X773
    • Published:2019

    移动端阅览

  • 李国奇, 郭传智. Method and Function of Setting Fire-proof Isolation Layer in Desulfurization Absorption Tower[J]. 2019, (3): 87-89. DOI: 10.16056/j.1005-7676.2019.03.025.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

14

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Cause Analysis and Treatment of Chemical Accidents in Commissioning of Large Thermal Power Units
Study on Inversion Method of the Absorption Tower in the Air

Related Author

钟选斌
伍绍君
牛勇
王刚
常辉
郭建锋
丁光柱
王小祥

Related Institution

广东科立恩环保科技有限公司
中电投江西电力有限公司新昌发电分公司
0