There has been a problem of low temperature of low pressure cylinder seal in thestart-up process of two units in a factory. After analysis
the main reasons are the temperature drop of the steam supply and the poor drainage of the pipeline.By taking effective measures to reduce the LP bypass steam entering the condenser and increase the steam supply pressure of low pressure cylinder seal
the hidden safety hazards in the start-up process of the unit are solved
which is equivalent to shortening the start-up time of the unit and achieving good results
thus providing a reference direction for solving the problems of the same type of units.