您当前的位置:
首页 >
文章列表页 >
Statistically Inducation of Failure Reasons of Buried Gas Pipeline
更新时间:2026-01-19
    • Statistically Inducation of Failure Reasons of Buried Gas Pipeline

    • Issue 2, Pages: 15-17+23(2019)
    • DOI:10.16056/j.1005-7676.2019.02.005    

      CLC: TU996.7
    • Published:2019

    移动端阅览

  • 李斌, 孙博, 王华. Statistically Inducation of Failure Reasons of Buried Gas Pipeline[J]. 2019, (2): 15-17+23. DOI: 10.16056/j.1005-7676.2019.02.005.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

109

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis and Optimization of Boiler Shutdown Maintenance Technology for 600 MW Unit
Talking about the Design of Waste Incineration Heat Recovery Boiler with High Parameter
Anti-corrosion Analysis of Circulating Water Structure in Coastal Power Plant
Discussion on Gas Pipeline Leakage Detection and Location Methods
Temperature Corrosion Reasons and Design in Waste Incineration Boiler

Related Author

姬保华
吴志革
赖茂江
裴达
刘苏蒙
李靖涛
刘浩
刘涛

Related Institution

广东珠海金湾发电金湾有限公司
江联重工集团股份有限公司
江苏省节能工程设计研究院有限公司
中国电建集团江西省电力设计院有限公司
国家电投集团江西电力有限公司
0