冯成. Experience Feedback and Good Practice about Procurement of Equipment in Photovoltaic Power Station of Nuclear Power in Jiangxi[J]. 2018, (4): 5-8. DOI: 10.16056/j.1005-7676.2018.04.002.
Experience Feedback and Good Practice about Procurement of Equipment in Photovoltaic Power Station of Nuclear Power in Jiangxi
but with the development of nuclear power in Japan after the Fukushima nuclear accident and the rapid economic development around the site of nuclear power plant being double influence
the pressure on nuclear power plant site protection is increasing. The idle land of the nuclear power plant site being used in Jiangxi Pengze nuclear power
construct new energy projects such as photovoltaic power station
and to apply nuclear power project management knowledge systems and practices to the procurement process of new energy projects such as photovoltaic. This paper summarizing from the selection of equipment procurement management mode
management system establishment
procurement planning
procurement package division
procurement document preparation
classification supervision
inspection
and spare parts management and so on
feedback on the good practices and experience in learning in the procurement management of equipment. Through experience feedback
the management level of similar projects will be improved.