您当前的位置:
首页 >
文章列表页 >
Arrangement Optimization of Flue Gas System in Boiler for the 1 000 MW Unit
更新时间:2026-01-19
    • Arrangement Optimization of Flue Gas System in Boiler for the 1 000 MW Unit

    • Issue 3, Pages: 115-117+135(2018)
    • DOI:10.16056/j.1005-7676.2018.03.028    

      CLC: TM621
    • Published:2018

    移动端阅览

  • 彭丹, 姚瑶. Arrangement Optimization of Flue Gas System in Boiler for the 1 000 MW Unit[J]. 2018, (3): 115-117+135. DOI: 10.16056/j.1005-7676.2018.03.028.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

107

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Design Optimization for Circulating-water Pump House of Blast Furnace
Reducing Power Consumption by Meticulous Management and Optimal Operation

Related Author

邹颖
戈文金
李利

Related Institution

江西新余钢铁有限责任公司第一动力厂
中国石化股份有限公司九江分公司
0