常辉, 郭建锋, 丁光柱, et al. Study on Inversion Method of the Absorption Tower in the Air[J]. 2018, (2): 37-40. DOI: 10.16056/j.1005-7676.2018.02.010.
Study on Inversion Method of the Absorption Tower in the Air
摘要
在火电厂脱硫系统中
吸收塔是不可或缺的一部分
其安装施工工艺有倒装法和顺装法2种。倒装法具有其他施工工艺无可比拟的优点
包括可以降低施工费用、缩短施工工期、减少施工的高空作业量、在施工时不受场地限制等
在吸收塔的施工过程中比较实用。针对超洁净排放改造工程中
吸收塔空中截体整体提升
通过采用空中倒装法施工工艺
顺利完成改造工作。质量控制、安全措施及注意事项得到验证
为类似工程的安装提供参考和借鉴。
Abstract
In the thermal power plant desulfurization system
the absorption tower is an integral part of the system. There are two kinds of installation process: inversion method and CIS fitting method. Flip chip method with other construction technology incomparable advantages including reduced construction cost
shorten construction period and reduce the construction amount of work high above the ground
the construction not subject to site constraints such as in absorption tower in the construction process more practical. The ultra clean emissions renovation project for
absorption tower air cut-off body lifting
by using the inversion method of construction process
finish the work smoothly. Quality control
safety measures and matters needing attention be verified
it provides reference and reference for the installation of similar projects.