1. 国家电投集团江西电力有限公司分宜发电厂
2. 江西省电力设计院
Published:2018
移动端阅览
[1]安城,但振宇,梁大镁.分宜发电厂#9机组播煤风改造[J].能源研究与管理,2018(01):84-85.
安城, 但振宇, 梁大镁. Optimization Retrofit of Fenyi Power Plant Spreading Coal Air[J]. 2018, (1): 84-85.
[1]安城,但振宇,梁大镁.分宜发电厂#9机组播煤风改造[J].能源研究与管理,2018(01):84-85. DOI: 10.16056/j.1005-7676.2018.01.022.
安城, 但振宇, 梁大镁. Optimization Retrofit of Fenyi Power Plant Spreading Coal Air[J]. 2018, (1): 84-85. DOI: 10.16056/j.1005-7676.2018.01.022.
分宜发电厂#9机组为1×330 MW循环流化床机组。该机组的播煤风系统接自锅炉的热二次风
长期运行以来播煤风压力偏低
无法将煤粉顺利送入炉膛
锅炉燃烧不稳定。通过改造后
将播煤风从热一次风母管接入
播煤风压力和温度均能满足机组要求
改造后机组运行平稳。
#9 unit of Fenyi power plant is a 330 MW circulating fluidized bed unit. The spreading coal air is connected with the boiler’s secondary hot air
and the pressure of the secondary hot air is low since the long-term operation
so the pulverized coal can’t be sent into the bolier furnace smoothly
and the combustion of the boiler is unstable. After the optimization retrofit
the coal breeze is transferred from the heat primary air pipe
and the wind pressure and temperature of the coal can meet the requirements of the unit
and the operation of the unit is stable after the optimization.