您当前的位置:
首页 >
文章列表页 >
Large-scale Oversea Coal-Fired Project Boiler Overheat and Tube-blasting Risk Precaution Measure
更新时间:2026-01-19
    • Large-scale Oversea Coal-Fired Project Boiler Overheat and Tube-blasting Risk Precaution Measure

    • Issue 3, Pages: 80-82(2017)
    • DOI:10.16056/j.1005-7676.2017.03.020    

      CLC: TM621.2
    • Published:2017

    移动端阅览

  • 王东方, 郭俊红. Large-scale Oversea Coal-Fired Project Boiler Overheat and Tube-blasting Risk Precaution Measure[J]. 2017, (3): 80-82. DOI: 10.16056/j.1005-7676.2017.03.020.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

23

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Strategy to Reduce the Start-up Energy Consumption of 600MW Supercritical Units
How to Strengthen Project Management of Thermal Power Plant Technical Transformation
Process-control and Energy-saving Optimization of the Starting Process in Supercritical Thermal Power Unit
Oxide Skin Protection Measures of High Moisture Lignite Fired Supercritical Once-through Boilers
Optimization Strategy for Coordinate Control System of 700 MW Supercritical Thermal Power Unit

Related Author

任绍军
朱颖
谢涛
赵晓林
曾名劭
李俊忠
曾名劭
陈健辉

Related Institution

广东珠海金湾发电有限公司
国家电投集团江西电力有限公司分宜发电厂
江西赣能股份丰城二期发电厂
内蒙古上都发电有限责任公司
新余钢铁股份公司第一动力厂
0