您当前的位置:
首页 >
文章列表页 >
Optimization of Starting Sequence of Turbine’s Governor Valves
更新时间:2026-01-19
    • Optimization of Starting Sequence of Turbine’s Governor Valves

    • Issue 2, Pages: 114-117(2017)
    • DOI:10.16056/j.1005-7676.2017.02.029    

      CLC: TM621
    • Published:2017

    移动端阅览

  • 王继涛, 张丁旺, 康剑南, et al. Optimization of Starting Sequence of Turbine’s Governor Valves[J]. 2017, (2): 114-117. DOI: 10.16056/j.1005-7676.2017.02.029.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

40

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A New Technology of Turbine Clearance Control——TCCS

Related Author

张丁旺
杨青云
胡方

Related Institution

No data
0